HOSE WORKSHOP LAYOUT ( ห้องอัดสายไฮดรอลิค ), J. Mining Overburden
As per our proposal if you request on the Swager , Onsite Service for Heavy Duty Machineries and hydraulic hose assembly facilities , herewith we are pleased to advise and locate our hose workshop layout for your area size less than < 4 M. x 9 M. Or 7 M. X 7 M. (approx. 36 – 50 s.q.m) , please kindly find attached copy of the layout and you will design on your side due to the size of the machine and quantity of the stocks you would like to put in your workshop.
Assuming the materials will be from the right side doors. The materials would be received into stock and the finished products despatched the same route.
1 The hose is taken from the hose rack and placed onto the turn-table.
2 The hose is measured across the cutter along the channel if necessary.
3 The hose can be skived if required. The fittings are selected from the fittings-rack and the hoses assembled on the bench.
4 The assembled hose are taken across to be swaged.
5 The hoses can be tested, if required and then cleaned, packed and despatched.
The objective is to have a flow of manufacturer from goods inwards through manufacture and out through dispatch with the minimum of traveling across the workshop to perform individual task.
Remaining at your disposal for any clarification. If you have any queries , please don’t hesitate to contact us .
THANKS FOR YOUR KIND CORPORATION.
Project Department
HOSE WORKSHOP LAYOUT, Job Mining Overburden